gob

1. Take that horrid gob of gum out of your mouth!
把你嘴里那块讨厌的口香糖吐出来!

youdao

2. I guess Gob smacked is appropriate, isn't it, Jack?
我猜想轰出采空区是适当的,是不是,杰克?

youdao

3. Motionless except when he leans to gob in the fire.
一动不动,除非要起身朝炉火吐口痰。

youdao

4. The other is used for the falling and collapsing of gob.
另一是由于采空区的崩落和塌陷。

youdao

5. Lastly, the paper simulates bolt timbering of the laneway along the gob.
最后,分析模拟了沿空巷道的锚杆支护情况。

youdao

6. Usually, gob areas are reconstructed for reclamation, fishpond, and plant.
一般来说,采空区的利用就是土地复垦、养鱼、绿化等。

youdao

7. Hook: Nineteenth-century settlers in Arizona get gob-smacked by extraterrestrials.
看点:面对外星人,19世纪亚利桑那的开拓者们震精了。

youdao

8. Coal mine gob has its unique geo-electrical identity, so it can be detected using TEM.
采空区地层有其独特的地电特征,可以利用瞬变电磁法进行探测。

youdao

9. This paper analyzed and calculated width of coal pillar for driving roadway along gob.
对沿空掘巷时煤柱的留设问题进行了分析和计算。

youdao

10. Some problems of bore grouting engineering for coal gob area are discussed in this paper.
文章对煤矿采空区治理工程中的钻孔注浆问题进行了讨论。

youdao

11. This paper systematically summarizes the gob gas migration law and numerical simulation research.
本文系统总结了采空区瓦斯运移规律及数值模拟研究成果。

youdao

12. Cementing tailings to fill gob area can both reduce environmental pollution and ground destruction.
将尾砂胶结后用于充填采空区,可以减少环境污染和地表破坏。

youdao

13. The drilling practice verified that the method is reliable, the inferred location of gob area is accurate.
钻探验证表明,这种探查方法可靠,所推断的采空区位置准确。

youdao

14. Absorbed in immediate interests mining out of order are main reasons of water inrush from gob area impoundment.
只顾眼前利益,无序开采,是发生采空区积水透水事故的重要原因。

youdao

15. As a result, active in the Shanghai real estate market speculators are evacuated Jiangzhe Shanghai, and many netizens gob.
因此,活跃在上海房地产市场的投机被疏散江浙上海,许多网民空。

youdao

16. Underground and ground transfer system of gas, pipeline layout and underground gob distribution have briefly been introduced.
简要介绍了瓦斯在井下和地面运输中的输配系统、管道敷设以及井下采空区分布状况。

youdao

17. The spontaneous combustion of coal of gob is one of the major calamities, which seriously influences safety production of mine.
采空区浮煤自燃是煤矿的主要灾害之一,严重影响了煤矿的安全生产。

youdao

18. The results show that the gob entry driving stabled is the first importart condition on improvingmaintain of the gob entry driving.
研究表明,采空区压实稳定是改善沿空掘巷维护状况的先决条件。

youdao

19. Based on the stability analysis of key-block with large structure, the feasibility of gob-side entry retaining has been demonstrated.
通过对大结构关键块稳定性分析,论证了综放沿空留巷的可行性。

youdao

20. Transient electromagnetic method (TEM) has special advantage and evident result as an approach for detection of water-accumulating gob.
瞬变电磁法(TEM)作为积水采空区的一种探测手段,有着独特优势和显著效果。

youdao

21. The results show that the gob entry driving stability is the first important conditions on improving maintain of the gob entry driving.
研究表明,采空区压实稳定是改善沿空掘巷维护状况的先决条件。

youdao

22. Practices demonstrate that the method is an effective means to detect geologic anomaly bodies of metal ore body and small mine gob area.
实践证明,瞬变电磁法是探测金属矿体、小窑采空区等地质异常体的一种有效手段。

youdao

23. The operation measures and effect of high-resolution resistivity prospecting in gob area, Daliuta Coal Mine, are introduced in this paper.
介绍了利用高分辨地电阻率法探查大柳塔煤矿小窑采空区的作业方法和效果。

youdao

24. As the enlarging investment of highway building in our country, some of highway tunnels are inevitable to cut through the coal strata and gob.
随着我国对高速公路建设的加大投入,有些公路隧道不可避免的穿过煤系地层和采空区。

youdao

25. I'm absolutely gob-smacked. I never, in a million, billion years thought that you were going to sing like that. You could sell a lot of records.
你惊到我了。我一点儿、一丁点儿都没想到你能唱这么好。你将来的唱片一定会大卖。

youdao

26. At last, the effectiveness of using integrated geophysical methods to the coal mine gob area survey with specific engineering exploration is proved.
最终,结合具体工程勘查实践,证明了在煤层采空区勘查中采用综合地球物理勘查技术的有效性。

youdao

27. A digital simulation is made to the rock pressure distribution of faces with large mining height when crossing gob, which may guide engineering practice.
针对大采高工作面过空巷时的矿山压力分布进行了数值模拟,以掌握其分布规律,从而对工程实践提出指导性意见。

youdao

28. A digital simulation is made to the rock pressure distribution of faces with large mining height when crossing gob, which may guide engineering practice.
针对大采高工作面过空巷时的矿山压力分布进行了数值模拟,以掌握其分布规律,从而对工程实践提出指导性意见。

youdao