Research on Sludge Water Property of Huyan Water Plant;
呼延水厂排泥水性质研究
The paper has analyzed the following reasons of higher water cost based on the water cost of stage one persion project, water cost of Huyan Water Plant and bearing capacity on water consumption of residents and industries.
通过介绍引黄一期工程成本水价和呼延水厂成本水价以及居民和工业企业的水消费承受能力,分析了成本水价偏高的原因:一是投产初期引黄工程销售水量远小于其供水能力,工程效益不能得到充分发挥;二是高额的贷款利息。
This paper introduces the components and control process of the automatic dosing control system in dewatering workshop of Huyan Water Plant, and analyzes the safe reliability of the system.
介绍了呼延水厂脱水车间加药自控系统的构成及控制过程,并对系统安全可靠性进行了分析。
Simulations are made to analyze call delaying probability and timeout probability of the network.
仿真分析了网络的呼叫延迟概率和呼叫延迟超时概率这两个重要的性能指标,结果显示在系统高负载情况下,本文提出的基于SIR的DCA相对于传统的信道分配方法能够获得更好的效果,从而实现了对高负载网络的优化。
The Soil and Water Loss in Huyan Diversion and Storage Project of Wanjiazhai YRDP (Yellow River Diversion Project)and Preventive Measures;
山西省万家寨引黄工程连接段备用水源呼延调蓄工程水土流失与防治对策
Based on introducing the geological condition of Huyan persion and storage project, this paper compares several foundation treatment schemes, and introduces the advantages of heavy tamping method.
在概述呼延调蓄工程地质条件基础上,比较了几种地基处理方案,详细介绍了强夯法的优势。