The elemental application of Visual Basic in the closure hydraulic calculation;
Visual Basic在围海堵口水力计算的应用初步探讨
Generally reclamation engineering includes seawall, sluice and final closure.
围海工程一般包括海堤、水闸、堵口三部分。
A new blocking method adapted to the breach of the main embankment at Jiujiang on the Yangtze River during 98 huge flood is intruduced,Three steps in the blocking project are included:closure,blocking and landlocking water.
介绍1998年洪水期间九江长江干堤出现溃口后采用的堵口方法和技术。