This paper explains the complexity of making freight train formation plan,brings in the multi-agent technology and founds the optimizing model of train formation plan based on multi-agent.
本文阐述了货物列车编组计划的复杂性,引入多Agent技术,建立了基于多Agent的编组计划优化模型,并重点讲述了Agent之间的交互机制以及车流合并过程,最后指出了该方法的优越之处,对于列车编组计划智能化编制具有借鉴作用。
It also finalizes the parameters for the optimization of train formation plan with relevant theoretical formulas as well as practical value based on experience.
对计算机编制列车编组计划系统从数据及参数处理、车流结构调整、专家干预和智能优化等4个方面进行了分析,对优化列车编组计划的参数确定,给出了相应的理论公式和实际运作中可行的经验取值方法。
This paper addresses the direct train formation plan problem for loading area.
本文主要讨论了装车地直达列车编组计划的优化问题。
Research on the optimization model of the block container train formation plan;
集装箱班列编组计划优化模型研究
Working out the train formation plans for technical service stations is an exceptionally large-scale combinatorial optimizing problem, and it is hard to solve with the mathematical method.
技术站列车编组计划编制问题属于超大规模的组合优化问题,求解难度较大。
The development of railway informationization facilitates the possibilityin establishing freight train formation plan by computer.
铁路信息化的发展为计算机编制货物列车编组计划成为可能,在进行系统需求分析和系统总体设计的基础上,确定了系统数据结构流程,并对系统的功能模块进行了设计,主要包括基础数据和车流数据管理;车流径路管理;重车车流量计算;专家决策支持;方案的联动优化;专家干预与人工调整等。
Research on existing problems in project plan formulation of enterprise;
企业项目计划编制中的问题及对策措施探索
plan for the formation of freight trains
铁路货物列车编组计划
OPTIMIZATION OF TRAIN MAKEUP PLAN WITH NONLINEAR RECLASSIFYING COST
具有非线性改编费用的列车编组计划优化
WORKING OUT OF TRAIN FORMATION PLANS FOR TECHNICAL STATIONS BY THE METHOD OF O-1 LINEAR PROGRAMMING
制定技术站列车编组计划的0—1规划法
Study on Multi-block Train Plan with Genetic Algorithm of Railway Station
铁路分组货物列车编组计划的遗传算法研究
Study on Direct Train Formation Plan for Loading Area;
装车地直达列车编组计划近似优化研究
Study on Optimizing System of Train Formation Plan Based on Multi-agent;
基于多Agent的列车编组计划优化模型研究
Study on the Optimizing Method of Railway Train Formation Plan and Train Scheduling Based on MAS;
基于MAS的列车编组计划与运行图的一体化优化方法研究
Non resort Operating Parameter Model for Technical Station s Train Formation Plan with Locomotive Extended Routing;
机车长交路条件下的技术站列车编组计划无调作业参数模型
Research on Robust Stage Plan of Railway Marshalling Station;
铁路编组站鲁棒性阶段计划编制研究
Design and implementation of EMU Operation Scheduling System
动车组运用计划编制系统设计与实现
Research on the Issues of Optimizing Operating Plan for Marshalling Station;
编组站作业计划优化编制若干问题研究
Research and Realization of Automatically Generating Marshalling Plan for District Local Train;
摘挂列车编组钩计划自动编制研究和实现
Head of audit team is responsible for making the audit plan.
审核组长负责编制审核计划.
Research on the System Design and Technology Problem of Marshalling Station Phase Plan System;
编组站阶段计划编制系统设计与若干技术的研究
The Quality Dept. is responsible for analyzing the causes and making plans for corrective actions.
质量部组织分析原因、编制纠正措施计划。
Research on the Relative Problems of Motor Train-Set Scheduling System;
动车组运用计划编制系统相关问题研究
Daily Ceneration Schedule for Thermal Power System under Consideration of Unit Ramp Rate;
考虑机组爬坡率的火电系统日发电计划编制
Study on Coordination of Hard and Soft Optimization of Marshalling Station Stage Plan;
编组站阶段计划刚性与柔性优化的协调研究