The generator sockets construction and the closely-related stability problem of lower side wall of Shuibuya Underground Powerhouse are key problems to solve in the powerhouse construction.
按照上述流程,利用前6层开挖的现场监测信息对有关岩层的力学参数进行反分析,根据反分析的参数对后续的机窝施工进行数值模拟计算和方案优化。