Plan optimization for digitalization design of mine construction drawings based on AutoCAD system
基于AutoCAD的矿山施工图数字化设计方案优化
Plan optimization for digitalization design of mine construction drawings based on AutoCAD system
基于AutoCAD的矿山施工图数字化设计方案优化
Haul Road Construction and Maintainance in Dexing Copper Mine Pit
德兴铜矿采矿场山顶公路施工与养护
Code for construction and acceptance of mining pit engineering
矿山井巷工程施工及验收规范
Design and Construction of Bored Metro Tunnels Passing Through Sand Layer
地铁矿山法隧道过砂层的设计与施工
Specification for non-ferrous metal mine shaft engineering construction and acceptance
有色金属矿山井巷工程施工及验收规范
Specification for non-ferrous metal mine shaft to installation engineering construction and acceptance
有色金属矿山井巷安装工程施工及验收规范
The reason of the contract issue in the mine engineering and its measures;
矿山工程施工合同纠纷产生的原因及预防
Construction technique research of wet sprayed concrete underground
地下矿山湿式喷射混凝土施工工艺研究
Bush waterproofing system used in tunnels with mine construction
衬套防水系统在矿山法施工隧道中的应用
The Study on Construction Control as well as the Geological Disaster Evaluation of Mine Geology Disaster of Emei Cement Plant;
峨眉水泥厂矿山地质灾害评价与施工控制研究
Underground Excavation Construction of Metro Tunnel Based on Ground Freezing Method
基于冻结法的地铁区间隧道矿山法暗挖施工
The mine tunneling construction numerical simulation supported by pipe shed in subway tunnel
地铁隧道管棚支护下矿山法施工数值模拟
The Design and Construction of the Entrance to Subway Mined Tunnel from Deep Foundation Pit
明挖基坑内地铁矿山法隧道进洞的设计与施工
Status and improvement measures of technological process for increasing Fe & decreasing SiO_2 in concentrates
歪头山铁矿提铁降硅工艺现状及改进措施
Mining method construction of the subway tunnel the control method of the land subsidence
地铁隧道矿山法施工与地面沉降控制方法
Collectively-owned mining enterprises must survey and draw maps showing the correlation between surface and underground workings.
集体矿山企业必须测绘井上、井下工程对照图。
This paper in detail presented the transition of shaft sinking equipment for drift excavation in Wangershan Gold Mine.
介绍了在山东省望儿山金矿立井施工中,利用立井凿井设施进行平巷施工的改装方法。
It also advances efficient measures for decreasing consummation of energy in the salt mine.
结合矿山生产实际,分析其工艺方案优劣、矿山运转设备的挖潜,并提出了节能降耗的有效措施。