56%, investment recovery period was 3.
56%,投资回收期3。
The understanding of FIRR, FNPV and investment recovery period is also given a popular explanation in this paper.
根据实际筹资情况对全部投资现金流量表计算指标进行思考和修正,并对FIRR、FNPV和投资回收期等指标的理解给予通俗的解释。
In order to provide reference for efficient management and scientific and rational investment,investment and output of Ganwu series demonstration forest in Camellia oleifera clone in Baitu Town of Fengcheng City were analyzed,and cash flow and investment recovery period were predicted by technical economy analysis method.
为给油茶的高效经营提供经济效益参考和科学合理投资的依据,调查分析了丰城白土镇赣无系列油茶示范林的投入产出情况,并采用技术经济分析方法预测其现金流量和投资回收期。
Compares the annual operation cost and payback period of the ice-storage system under different electricity prices.
从初投资和运行费用角度,对深圳某厂房冰蓄冷空调系统与常规空调系统进行经济比较;对不同电价政策下的冰蓄冷空调系统的年运行费用和投资回收期进行比较;提出对于三段分时电价,采用平峰电价的加权平均值代替峰时电价来计算峰谷电价比更为合理。
It is concluded that the model of appraisal is generally subject to the way of operation and management thereof, and that an internal earning rate of 4% before the income tax, and a payback period of 18 years, including the time for construction, are appropriate.
财务评价是项目可行性研究的重要内容, 本文对污水处理项目财务评价的几个具体问题作了较为系统的探讨, 结果表明: 评价模型主要取决于污水厂投产后的运营管理模式; 财务内部收益率( 所得税前) 取4% 、投资回收期( 含建设期)为18 年左右是较为合适的。
Aiming at improving the indexes on payback period, Dr.
D·H·艾伦博士提出等效最大投资周期指标用以评价项目投资的效果,以期对投资回收期指标予以改进。
For example,this article presented the static investment payback period was 2.
以福州市洋里污水厂出水回用为例,运用费用效益分析方法计算得出静态投资回收期为2。
This article analyses the relationship between investment payoff period and discount rate, and studies the methods to determine investment payoff period and discount rate when we assess the economic value of a project.
动、静态投资回收期及财务净现值(FNPV)和经济净现值(ENPV)是确定工程项目是否能接受的重要参数,而基准折现率和社会折现率又是项目价值判断的标准。
Based on the main influencing factors for investment payoff period and analysis of their probability distribution model,a simulation model for payoff period of construction investment was established using the random number generator to simulate the variation of the influencing factors.
在提出投资回收期的主要影响因素并分析其概率分布模型基础上,利用随机数发生器模拟影响因素的变化,建立了项目投资回收期的仿真模型;最后举实例分析了当净现金流量满足β分布时建设项目投资回收期的仿真模型,模拟结果表明该方法可以为项目投资决策提供依据。
Finally, the capital pay-off time is determined as 14 years and the profits rate is 12% per year.
详细分析了土地征用、建筑工程和设备投资、办学收入和运营费,最终确定投资回收期为14a,内部收益率约12%。
The payback period of investment: Including 2.9 construction periods.
投资回收期:包括建设期2.9年。
What is the payback time for the investment of the development of the product or service?
开发新产品或服务的投资回收期?
The Forecast of Economic Benefit: The investment capital is recovered9 to12 years.
经济效益预测:投资回收期9—12年。
An Analysis of Payback Period of Investment and Energy Consumption on Ice Storage Air-conditioning
冰蓄冷空调的投资回收期及能耗分析
New Method of Interpolation for Internal Rate of Return and Pay Back Period;
内部收益率和投资回收期的内插值新算法
Analysis of A Index for Evaluation of Construction Project Finance--Investment Recovery Term;
建设项目财务评价指标——投资回收期浅析
The Positive Analysis of Pay-Back Period Based on the Changes in Labor Cost
人工成本变动的项目投资回收期实证分析
The Forecast of Economic Benefit: The net profit is92 million Yuan RMB, the recovery duration investment capital is4 years.
经济效益分析:净利润9200万元人民币,投资回收期4年。
The Forecast of Economic Benefit: The annual tourists are300 thousand and the investment capital can be recovered in6 years.
经济效益分析:年游客容量30万人次,投资回收期6年。
The Forecast of Economic Benefit: The annual profit could be20 million Yuan RMB, the recovery duration is7 years.
经济效益分析:年利润2000万元人民币,投资回收期7年。
The initial investment is never recover.
期初投资根本没收回。
The payback period is the time required for a firm to recover its original investment.
回收期是指企业收回其原始投资所需的时间。
If there are additional investments or disinvestments, the cost of the long-term equity investment shall be adjusted.
追加或收回投资应当调整长期股权投资的成本。
yield-sensitive capital
短期资本,短期收效投资
pay-off method for capital investment
资本投资回收年限法
Research on the Significance of Payback Rule to Management of Innovation Investment;
回收期法则对创新投资管理的意义探讨
Investors tried to recover money instead of investing it.
投资者试图把钱收回来,而不用以投资。
The investors recouped their total investments three years ahead of schedule.
投资者提前计划3年收回了整个投资。