With the background of developments of infrastructure, aiming at limited resource financing to a BOT (build operate transfer) project a model of risk revenue allocation between the lenders and the BOT project company is established.
以基础设施建设为背景 ,针对BOT项目的有限追索权融资方式 ,建立了贷方和项目公司之间的风险收益分配模型 ,根据委托代理的理论和思想 ,分析了贷方和项目公司的风险态度和风险收益的分配问题 ,得到了使贷方和项目公司的收益同时达到最优的收益平衡条件 ,解决了贷方和项目公司之间的利益冲突问题 ,验证了BOT融资模式的有效性和可行
The discussion on the increments of a finitely weighted Winener process;
有限加权和型维纳过程增量的探讨
About the Dialectical Relations between Finite and Infinite;
谈谈有限与无限的辩证关系
Men are Finite and Infinite——Mou Zongshan s Surmounting of Kant s Preposition of "Men are Finite and Rational Existence";
人虽有限而可无限——牟宗三对康德“人是有限的理性存在”命题的超越
Finiteness & infiniteness of traditional architecture;
传统建筑空间的有限与无限
Government non-intervention and Government intervention——Analysis on Mill s intervention thought of limited government;
政府放任与政府干预——密尔有限政府干预思想解读
Introspection on Material Needs: Unlimited or Limited;
反思物质需求:无限还是有限
A Limited Resource Model of Self-Control and the Relevant Studies;
有限自制力的理论假设及相关研究