This paper analyses the forces acting on caisson construction jetty in open shore and proposes that the calculation of the stability of caisson construction jetty in open shore should take into account ship\'s berthing status and wave action status,finally,presents a stability calculation formula of the jetty.
通过对无掩护突堤式沉箱码头上的作用力分析,提出计算码头稳定性时要考虑船舶靠泊码头状态和只受波浪状态,并给出了码头稳定性计算公式。
Wharves, quays and piers are often in the general port language combined in one terminology--docks.
顺岸式码头和堤岸式码头以及突堤式码头可用一个港口术语统称为码头。
a Pier is usually a rectangular wharf structure which projects out into the water.
突堤式码头通常都是矩形码头结构局部突出到水中。
Because of its geometry, it can be used for berthing of vessels on three sides.
由于其几何形状,突堤式码头三面都可停靠船只。
A pier does not necessarily need to run perpendicular to the shoreline but may project under any angle.
突堤式码头并不一定要和岸边垂直,可以以任何角度向外突出。
In the United Kingdom, it is often referred to as a jetty. It may also be called a mole, and in combination with a breakwater, it is frequently termed a breakwater pier.
在英国这种码头常称为凸式码头或突堤,而且常常和防波堤连为一体,故称为防波堤码头。
Pile Cap Construction Technology in Extention Works on East Side of Pier No.3 of Tianjin Port
天津港三突堤东侧码头改造工程桩帽施工工艺
Study on General Layout for No.3 Mole Berth in Zhifu Harbour Area in Yantai Port
烟台港芝罘湾港区三突堤码头平面布置研究
Analysis and Solution to Cracking of Surface Course of Container Terminal at Northern Side of East Pier in Tianjin Port
天津港东突堤北侧集装箱码头面层裂缝原因分析与处理
Some Problems in Construction of Ore Terminal at thc South Side of East Mole in Port Tianjir
浅谈天津港东突堤南侧矿建码头施工中的几个问题
At Pattara Marina we board M/5 Mai Thai.
在芭堤雅码头我们乘五号码头的湄泰号轮船。
The minimum length of a quay should be sufficient for mooring the longest ship expected to arrive.
堤岸式码头的最低长度应足以停靠可望到达的最长船只的长度为准。
Experimental Study of Oblique Wave Force Acting on a Vertical Breakwater Head
斜向波对直立式防波堤堤头作用的试验研究
A pier running out into the sea.
突伸到海中的码头。
reinforced concrete piled jetty
钢筋混凝土桩突码头
In 1998, it was responsible for the maintenance of 105 km of seawalls and 290 piers.
年内,该署负责维修105公里的海堤和290个码头。
The Civil Engineering Department is also responsible for maintaining public marine facilities. It inspects and repairs public marine structures including breakwaters, beacons, piers and seawalls.
土木工程署也负责保养、检查和修葺公众海事设施,包括防波堤、航标、码头和海堤。
The Civil Engineering Department is responsible for planning, design, and construction of public marine facilities including piers, beacons, breakwaters, seawalls, navigation channels and anchorage areas.
土木工程署负责策划、计和兴建公众海事设施,包括码头、标、波堤、堤、道和船只碇泊处等。
hollow concrete quay wal
空心式混凝土码头墙