Friction forces of earth acting on the anchor bar of bridge dais were measured for 20 hours on the spot.
本文对锚拉桥台的锚拉杆进行了长达20小时的现场监测试验。
Friction forces of earth acting on the anchor bar of bridge dais have been measured as long as 20 hours on the spot.
对锚拉桥台锚拉杆进行了20小时的现场试验,获得了大量实验数据,对张拉后锚拉杆的张拉力与长度、时间、温度和焊接接头的关系以及土对锚拉杆的摩阻力变化及分布规律作了分析与研究。
This paper puts forward a kind of new construction technology–Cross anchor.
针对特大断面隧道采用双侧壁导坑法施工时预留核心土的稳定性问题,提出一种新的隧道施工工艺——对拉锚杆。
The planning of parameters and selection of materials and facilities, and procedure of the productive test of tensile anchorage bar are described, meanwhile, the test result is analysed.
系统介绍了张拉锚杆生产性试验中参数拟定、材料及设备选择、试验步骤、工艺流程、成果分析,为张拉锚杆的施工质量、工程进度和施工安全提供了依据。
Friction forces of earth acting on the anchor bar of bridge dais have been measured as long as20 h on the spot.
本文对锚拉桥台的锚拉杆进行了长达20小时的现场监测试验。
Anchoring capacity of tensile rock bolt in ultimate limit state
极限状态下岩体受拉锚杆锚固承载力的计算
An Analysis Method of the Whole Working Course for the Force Transferring Mechanism in Fixed Segment of Tensile-type Anchor Bar
拉力型锚杆锚固段传力机理的全过程分析方法
The pull rod is screwed into the inside thread of the anchor head.
将拉杆旋入锚头内的丝扣。
Experimental Study on Tensile Character and Failure Mechanism of GFRP Rebar;
GFRP锚杆抗拉特征及破坏机理试验研究
Numerical simulation on pull-tests of a cable by FLAC_3D
FLAC_3D的锚杆拉拔数值模拟试验
Numerical Simulation of the Pullout Test of Wholly Grouted Cable
全长粘结式锚杆拉拔试验的数值实现
Experimental Study on Anchorage Mechanism of Locking Anchor under Tension Together Shear Loads;
在拉剪组合荷载作用下自锁锚杆锚固性能试验研究
Experimental and Analytical Study on Pull-out Resistance of Adhesive Anchors;
粘结型锚杆拉拔承载力的试验与理论分析
Field Testing and Numerical Analysis on Tensile Type Anti-float Anchor;
拉力型抗浮锚杆的现场测试与数值分析
Numerical Simulation and Its Application to Prestressed Anchor Based on the Fast Lagrangian Analysis Method
拉格朗日差分法的预应力锚杆数值模拟与应用
MODIFICATION OF FIP STRUT-AND-TIE MODEL FOR DESIGN OF INTERIOR ANCHORAGE ZONES OF POST-TENSIONED CONCRETE STRUCTURES
预应力混凝土内部锚固区拉压杆模型的修正
Model test on bearing behavior of pile-wharf structure without anchored retaining wall by tie rods or batter piles
无锚碇墙拉杆的直桩码头受力性状模型试验
Comparison and Study of Tensioning Hangers Scheme for Single-pylon Self-anchored Suspension Bridge
独塔自锚式悬索桥吊杆张拉方案比较研究
Strut-and-tie model reinforcement of the external prestressed box-beam anchor block
体外预应力箱梁锚固块拉压杆模型法配筋
nuts of an anchor
有杆锚杆孔上下的杆箍
explosively anchored
炸药爆破锚固锚杆法
Analysis on Productive Test of Tensile Anchorage Bar in East Side-wall of Underground Power House of Dongping Hydroproject
洞坪水电站地下厂房东端墙张拉锚杆生产性试验分析