1.The replacement cost estimation was researched. The methods of parent ships, subentry estimation and particular estimation were brought out.
对渔船重置成本估算进行了研究,提出了船换算法、分项估算法和重置核算法;
2.By the way, this paper also brings up the arrangement and principle of subentry measure.
此外,文中提出了分项计量的划分和计量的注意事项、安装原则等。
3.It is difficulty to calculate subentry of uncertainty in nanoindentation because there are many factors.
纳米压痕试验中对测试结果产生影响的因素很多,如果计算各个分项相当困难。
4.confirm the equipment and quote price by subentry.
确定设备并分项报价。
5.Based on this, a unified formula for the loads subentry considering concrete and steel fiber is given.
进而本文在此基础上提出关于混凝土和钢纤维分项的统一计算表达式。
6.subentry engineering test number 1370, project an evaluation number 1370.
分项工程检验数1370,分项工程一次评定数1370。
7.Capital Management Cost Management Cost Subentry Management Standard Cost Project Cost Budget Management(Enterprise)
资金管理成本管理成本分项管理标准成本项目成本预算管理(企业版)
8.Methods for Coding of Uniform Units, Distribution and Subentry Engineering in Highway Construction
在公路施工中统一单位、分布、分项工程编码的方法
9.Application of subentry coefficient method in reliability design of connecting rod structure
分项系数法在连杆结构可靠性设计中的应用
10.Reliability method and subentry coefficients of fatigue design for military bridge
军用桥梁疲劳可靠性设计方法和分项系数