1.The core how to achieve the right moment and right amount "hangs mudding off" is accurate and prompt assurance liquid level change.
实现适时、适量“吊灌”的关键核心是能准确、及时的把握环空液面的变化。
2.At the cross-section graphics in the hub area, the mudding intercalations in the strata ranged from 1. 77% to 27. 21%.
枢纽区该泥化夹层岩组在实测地层剖面中,所占比例变化较大(1.77%~27.21%)。
3.Research on Earth-pressure Balanced Shield Machine of Mudding Type and its Mating Techniques
加泥式土压平衡盾构机及其配套技术研究
4.Test and research on slime settling under mudding conditions
泥化条件下煤泥沉降试验与研究
5.Road mudding at Huanglong section of Weinan-Qingjian highway
渭清公路黄龙段道路翻浆成因
6.Talking about the Prevention of Subgrade Mudding
浅谈路基翻浆的防治
7.An Analysis of Mudding Software Market in China
国内录井软件市场分析