With application of pre-stressed concrete pressure vessels(PCPV) instead of steel pressure vessels as the primary circuit pressure boundary of MHTR,the residual heat removal system must be designed specially.
采用预应力混凝土压力容器(PCPV)代替钢制压力容器作为MHTR的一回路压力边界,对余热排出系统设计提出了特殊要求。
prestressed concrete reactor vessel
预应力混凝土反应堆容器
precast prestressed concrete beam
预制预应力混凝土梁
prestressed precast concrete pile
预应力预制混凝土桩
Research on Pseudo-dynamic Seis mic Response of Reinforced Concrete Flat-beam Frame and Pre-stressed Contrete Flat-beam Frame
普通钢筋混凝土和预应力混凝土框架的拟动力地震反应研究
med ore-stressed concrete steel wire
预应力混凝土异形钢丝
prestressed reinforced concrete sleeper
预应力钢筋混凝土轨枕
monoblock prestressed concrete sleeper
整体预应力混凝土轨枕
centrifugal prestressed concrete pile
离心预应力混凝土桩
prestressed concrete rail fastening
预应力混凝土轨条扣件
long line prestressed concrete
长钢丝预应力混凝土
lining segment of prestressed concrete
预应力混凝土衬砌块
Freyssinet concrete hinge
预应力混凝土铰接结构
post-tensioned prestressing concrete beam
后张法预应力混凝土梁
pretensioning prestressed concrete
先张法预应力混凝土
post tension concrete
后张法预应力混凝土
prestressed concrete bridge erection
预应力混凝土桥架设
Institute of Concrete and Prestressed Concrete
混凝土及预应力混凝土分会
Earthquake Action Analysis of Large-diameter Prestressed Concrete Silo;
某大直径预应力混凝土筒仓地震反应分析